all projects

city of toronto sport courts.

Tennis and pickleball court repairs at 22 City of Toronto parks, designed and administered by thinc design under the Back on Track program.

Rendered concept plan of Kingsview Park showing two tennis courts, two pickleball courts, a seating area, water station and new asphalt path
client
City of Toronto, Parks, Forestry and Recreation
location
Toronto, Ontario
year
2024 to 2026
status
ongoing
thinc's role
prime consultant and landscape architect: site investigation, court and pickleball design, drainage, lighting and fencing design, tender documents, contract administration
team
MJS Consultants (electrical)

Back on Track is the City of Toronto's program to bring neighbourhood tennis courts back to a state of good repair. thinc design is the prime consultant for the work across four districts, covering 22 parks. Each park gets its own investigation and design, from surface repairs to fencing, drainage, lighting and accessible routes.

Pickleball is a big part of the brief. At each park the question is how the courts can be shared. The options range from repairing the tennis courts as they are, to painting pickleball lines onto them, to converting part of the footprint into dedicated pickleball courts with their own fencing and lighting. The right answer depends on how many courts a park has, who plays there and what the neighbours can live with.

For every park we survey the site, work with an arborist and an archaeologist where needed, and design the surface repair, new fencing and gates, grading and drainage, court lighting and electrical cabinets, and accessible access to the courts. Where it is feasible we add water bottle filling stations, shelters and new park furniture. We then prepare tender documents and administer construction through to warranty.

Courts at many of the parks are now built, others are under construction, and a few are still in design or waiting on approvals.

Etobicoke York: Kingsview Park, Martingrove Gardens Park, Laburnham Park, High Park, Maple Leaf Park, Lanyard Park.

East York: Symington Avenue Playground, Ramsden Park, Oriole Park, Sewage Treatment Plant Park, Norwood Park.

North York: Rockford Park, Baycrest Park, Howard Talbot Park, Graydon Hall Park, Ruddington Park, Hendon Park.

Scarborough: Prairie Drive Park, McGregor Park, McDairmid Woods Park, L'Amoreaux Park, Malvern Park.

Water ponding across the existing tennis court surface at Kingsview Park behind chain link fencing
Kingsview Park: ponding on the existing court before repairs
Fresh asphalt and gravel base for the new court at Maple Leaf Park with a paver and light poles under a cloudy sky
Maple Leaf Park: paving under way
Asphalt paver laying a new surface beside temporary fencing at Maple Leaf Park
Maple Leaf Park: new asphalt surface being placed
New concrete curb and tall galvanized fence posts under construction at East York Sewage Treatment Plant Park
East York Sewage Treatment Plant Park: new curb and fence posts
New concrete curb beside the graded court footprint and fence posts at East York Sewage Treatment Plant Park
East York Sewage Treatment Plant Park: concrete curb and graded base

more parks

Shade structure, picnic tables and playground at Harding Park, Richmond Hill harding park City of Richmond Hill · completed
Playground with swings, play structure and shade pavilion beside a curving concrete path at Willowdale Park willowdale park City of Toronto · in construction