all projects

Little Italy BIA Streetscape Master Plan.

A streetscape master plan for College Street in Little Italy, built around bold paving, new parkettes and gateways, and a simpler, less cluttered sidewalk.

Rendering of College Street in Little Italy with parklet patios, umbrellas and string lights
client
Little Italy BIA
location
College Street, Shaw St to Bathurst St, Toronto, Ontario
year
2023 to 2026
status
master plan approved, first gateway pending installation
thinc's role
landscape architect and lead consultant: inventory and analysis, stakeholder and public engagement, streetscape design, cost estimates, implementation and funding plan, gateway artist call and selection

Little Italy's stretch of College Street, from Shaw Street to Bathurst Street, is one of Toronto's best-known restaurant and patio streets. The Little Italy BIA retained thinc design to prepare a Streetscape Master Plan to guide improvements to the public realm over the short, medium and long term.

The work began with a detailed inventory of the street: seating, paving, lighting, utilities, trees, parking, transit stops, public art and accessibility. It found a crowded and fragmented sidewalk, with only five municipal benches along the whole BIA, clusters of competing poles at intersections, and places where the 2.1 metre pedestrian clearway is not met. Stakeholder meetings and a public open house in October 2024 helped shape the direction.

The plan's guiding idea is to simplify before adding. Five big moves organize the pedestrian realm from curb to building face, replace plain concrete with a bold, distinctive paving pattern, unify the furniture palette, turn underused corners into parkettes and gateways, and remove clutter wherever possible.

The street is divided into three zones, each with its own character: La Curva (the bend) from Shaw to Grace, La Passeggiata (the promenade) from Grace to Manning, and Il Viale (the boulevard) from Manning to Bathurst. Proposals include gateway features at Shaw and Bathurst, parklet patios and catenary lighting through the promenade, consolidated seating and bike parking, and greening of boulevard parking.

The plan closes with an implementation strategy that breaks the work into 36 coded projects, with capital cost estimates, a phasing schedule and a funding plan, so the BIA can choose what to build and when.

The plan was approved, and the BIA moved quickly on its first project: the eastern gateway at Bathurst and College. thinc design prepared and ran a two-stage call for artists and sat on the selection committee with the BIA and the Ward Councillor's office. Local artist Jordan Sook Studios was selected, and their lit gateway sculpture, Spoon and Fork, is pending installation at the Bathurst entrance to Little Italy, subject to City approval.

Rendering of gateway features at the corner of College and Bathurst streets
Bathurst Street gateway, the eastern entrance to Little Italy
Rendering of the Shaw Street gateway parkette on College Street in daylight
Shaw Street gateway by the library, day
Rendering of the Shaw Street gateway on College Street lit at night
Shaw Street gateway, night
Rendering of a Little Italy sidewalk with patterned paving, a colourful bench and street trees
Bold paving, consolidated seating and street trees in the furnishing zone