Centennial Park Skating Trail.
A new refrigerated skating trail where Centennial Park's ski hill used to be, in Etobicoke.
- client
- City of Toronto, Parks, Forestry and Recreation
- location
- Centennial Park, Etobicoke
- year
- 2023 to present
- status
- under construction, opening for the 2026–27 season
- thinc's role
- prime consultant and landscape architect: analysis, concept, detailed design, contract documents, contract administration
- team
- Moon-Matz (mechanical), Pinpoint Engineering (civil), Orbit Engineering (geotechnical)
Centennial Park opened in 1967, and its small alpine ski hill was built on top of a former municipal landfill. With demand changing, the City of Toronto is retiring the ski hill and turning the area into a new refrigerated outdoor skating trail.
thinc design is the prime consultant and landscape architect, leading a team of mechanical, civil and geotechnical engineers from site investigation and concept through contract documents and construction. The trail loops beside the existing ski chalet, and the work includes upgrades to the chalet and the former ski lift building to house the refrigeration equipment and support the trail.
Building on a former landfill shaped the design, from engineered fill and drainage to how site services are routed. The trail is now under construction and is set to open for the 2026–27 skating season.







more parks
allan gardens teaching garden
City of Toronto · completed
ranleigh park
City of Toronto · completed
richardson beach
City of Kingston · complete