all projects

york regional forest trails plan.

Trail planning, design and management guidelines, and a preferred trail network, for the 24 tracts of the York Regional Forest.

Winter view of the Hollidge Tract trailhead in the York Regional Forest, with a log-and-glass pavilion, timber rail fencing and pines beyond
client
The Regional Municipality of York
location
York Region, Ontario
year
2022 to 2026
status
final submission December 2025
thinc's role
landscape architect and lead consultant: visitor profiles, trail classification, design guidelines and standards, asset strategy and preferred trail network
size
24 forest tracts, over 2,540 hectares

The York Regional Forest is a collection of 24 tracts covering more than 2,540 hectares, first established in 1924 and now visited by roughly 1,600 people a day. A network of about 153 kilometres of sanctioned trails, and another 81 kilometres of trails made by visitors, crisscrosses it. The Region retained thinc design to turn its 20-year forest management plan into a practical trails strategy.

The work ran in seven phases. We started with background research and a review of best practices, then defined the forest's visitors and what each group needs from a trail: social walkers, people seeking quiet time in nature, runners and hikers, riders, and Region staff who need to get in to manage the forest. From those profiles we built a trail classification system, with a Forest Access Route and three trail types, each with its own intent, dimensions, surface and typical cross section.

The design guidelines and standards cover trails, parking, vehicle and pedestrian entrances, private access points, benches, boardwalks and bridges, with accessibility built in and an updated accessible trail standard. An asset strategy sets out maintenance, rehabilitation and replacement over the life of each asset, to inform the Region's capital planning.

The final phase applied all of it to the forest itself. For every tract we mapped existing sanctioned and unsanctioned trails against slopes, soils, wetlands and watercourses, measured trail density, and recommended which trails to keep and classify, which to develop, which to decommission and which to study further. The same review covered parking and access points. At Hall Tract, for example, the preferred network cuts 16.9 kilometres of trails to 11.2, while upgrading the best of the visitor-made trails into planned loops.

The plan was developed with a Technical Advisory Team, the Regional Forest Advisory Team and the York Region Accessibility Advisory Committee, through five rounds of review.

Snow-covered information kiosk and regulatory signs at the Hollidge Tract entrance in the York Regional Forest
Hollidge Tract information kiosk, March 2023
Snow-packed forest trail running between tall pines and hardwoods in the Hollidge Tract
Forest trail, Hollidge Tract, March 2023
Curving granular trail through summer meadow grasses and wildflowers in the Nobleton Tract
Granular trail, Nobleton Tract, July 2024
Granular trail passing a mature tree and open meadow in the Nobleton Tract
Trail through meadow, Nobleton Tract, July 2024
Granular trail bending past white wildflowers under a blue sky in the Nobleton Tract
Trail edge wildflowers, Nobleton Tract, July 2024
Wooden trail marker post standing in tall meadow grass in the Nobleton Tract
Trail marker, Nobleton Tract, July 2024
Mown grass trail cutting through a tall meadow in the Nobleton Tract
Mown grass trail, Nobleton Tract, July 2024
Crushed stone trail curving along a conifer forest edge in the Nobleton Tract
Forest edge trail, Nobleton Tract, July 2024

more projects

prince edward point national wildlife area Canadian Wildlife Service, Environment and Climate Change Canada · complete
grimsby parks master plan Town of Grimsby · complete
Rendering of people walking a dog on a new trail through mature forest in Beaver Woodland, Richmond Hill richmond hill trails City of Richmond Hill · in design